KLIDONAS Project Proposal

Dear Alex & Erin

Thank you for your time in considering Center Island Contracting, Inc. for your project. We will not waiver in our commitment to provide you with great value, unparalleled service, security and convenience. I look forward to further discussing the project with you, once you have had a chance to review our proposal.

As detailed as we are, we have prepared a thorough proposal- listing your scope of work item-by-item, and organized by trade specialty.

We know this can be a bit overwhelming to take in at first, so we also prepared a summary, organized by the various portions of the overall project, for your convenience.

exteriorhouznew

Project Summary

PREVIOUS BATHROOM PROJECTS

Direct Replacement Hall Bath (2nd Floor):   $24,785

Necessary plumbing for installation of new toilet, sink & faucet, shower and handheld, and tub

  • Remove and cart existing PLASTER bathroom down to exposed framing
  • Install Panasonic Whisper Fan controlled by timer and vented to exterior of home
  • Install 4 recessed "Hi Hat" lights, controlled by dimmer switch
  • Install (1) Client supplied light fixture over vanity
  • Remove existing radiator
  • Remove exterior door
  • Necessary Framing for installation of new window
  • Supply & Install new radiator
  • Installation of tile throughout floor area
  • Installation of wall tile throughout all four walls
  • Install bathroom wall-mounted accessories

Includes $6,600 allowance for cabinets, counters, fixtures & tile

PREVIOUS BATHROOM PROJECTS

Miscellaneous Construction Items:  $74,215

  • Remove and replace windows throughout (32 total)
  • framing and installation of new bathroom window
  • Remove & cart carpeting in (3) bedrooms
  • Sand & Finish Floors throughout
  • Necessary electrcial work to provide new lighting and outlets as per clients request [(32) HI HATS on dimmers, (1) 3 way switch, (2) wall outlets, necessary removals and circuits]
  • Remove den plaster ceiling, supply and install new sheetrock

 

Includes $17,600 window allowance

ADMINISTRATIVE:  $7,478

  • Acquire required plans.
  • Submit necessary filings.
  • Arrange municipal inspections.
  • Provide temporary facilities for workers.
  • Maintain required insurances and certificates.
  • Perform job-site cleanup.
  • Remove all construction debris.
  • Arrange & assist in material deliveries.
  • Maintain jobsite supervision.
  • Provide weekly written updates to homeowners.
  • Maintain online portal for documents, photographs, and scope of work changes.

SUMMARY

Bathroom renovation:

Interior Upgrades/Finishes:

Misc. Allowances (Pay Directs):

Admin:

 

$24,785

$56,615

$17,600

$7,478

Total Projected Cost:

-Allowances (pay directs):

Total CIC contract:

 

$106,478

-$24,288

$82,190

Testimonials

5/5
google-open

I recently had the absolute pleasure of working with Center Island Contracting for my kitchen remodel, and I am overjoyed with the incredible results! From start to finish, their team displayed the utmost professionalism, craftsmanship, and attention to detail that exceeded all my expectations.The communication and collaboration with Center Island Contracting were outstanding.

google-close
5/5
google-open

During COVID, me and my wife thought of having a nice master bedroom addition(with en-suite ) and walk-in closet that looks and feel like a nice hotel (since you can’t travel at that time). Center Island Contracting made that happen for us. We are very happy with what they did to our house.

google-close