---
title: "Long Island Kitchen Remodel Pricing Guide"
url: https://centerislandcontracting.com/guides/long-island-kitchen-remodel-pricing-guide/
date: 2026-05-19
modified: 2026-06-12
lang: en
author: "Evan-CIC"
description: "2026 Edition How Much Does a Kitchen Remodel Cost on Long Island in 2026? Direct replacement. Reconfigured layout. Open-concept rebuild. Three scopes, three budgets. Here's what determines yours. Schedule a..."
word_count: 2698
---

# Long Island Kitchen Remodel Pricing Guide

2026 Edition

# How Much Does a
Kitchen Remodel
Cost on Long Island in 2026?

Direct replacement. Reconfigured layout. Open-concept rebuild. Three scopes, three budgets. Here's what determines yours.

[
Schedule a Consultation
](https://centerislandcontracting.com/schedule-a-consultation/)

Jump to Prices

### 0+
Years Building on Long Island

- [ ![Trustindex](https://cdn.trustindex.io/assets/platform/Trustindex/icon.svg) Trustindex rating 4.8 ![Trustindex star 1](https://cdn.trustindex.io/assets/platform/Default/star/f.svg)![Trustindex star 2](https://cdn.trustindex.io/assets/platform/Default/star/f.svg)![Trustindex star 3](https://cdn.trustindex.io/assets/platform/Default/star/f.svg)![Trustindex star 4](https://cdn.trustindex.io/assets/platform/Default/star/f.svg)![Trustindex star 5](https://cdn.trustindex.io/assets/platform/Default/star/f.svg) ](https://www.trustindex.io/reviews/www.centerislandcontracting.com/lang/en)

2026 Kitchen Pricing By Scope

## Three Scopes. Three Different Budgets.

Kitchen remodels price by what you're changing, not square footage. Tier 1 and Tier 2 ranges below assume a typical Long Island kitchen with standard appliance count and a mid-range selection level. Tier 3, structural openings, relocated kitchens, or rebuilding adjacent space, is priced by plans.

![icon-kitchen](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen.png)
01

### $75K-$125K

#### Tier 1 · Direct Replacement

Demo existing kitchen down to the studs. New mechanicals, insulation, drywall and flooring. Install new cabinetry, counters, appliances and fixtures. More than a refresh, but no new construction beyond the existing kitchen walls.

5-8 Weeks

Details

![icon-kitchen-cabinetry](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen-cabinetry.png)
02

### $100K-$150K

#### Tier 2 · Reconfigured Layout

Break down the dining room wall, relocate the kitchen into the living room, reimagine the whole floor. Still a gut down to the studs & rebuild, but utilize the home's existing space in a modern way.

9-14 Weeks

Details

![icon-kitchen-extension](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen-extension.png)
03

### $150K and up

#### Tier 3 · Open-Concept Conversion

Extend into the back or side yard. Reimagine the dining room or living room. Adding new space allows you to start your kitchen from a blank canvas. Design the dream kitchen first, then build the space to suit your vision. Everything brand new, in a new space.

14-24 Weeks

Details

Before You Start

## Why kitchen remodel costs vary so much on Long Island.

The phrase "kitchen remodel" covers three very different projects. Replacing cabinets and counters where nothing moves is not the same job as relocating a sink and range, and neither is the same as removing a load-bearing wall to open the kitchen to the family room.

The scope determines the trades involved, [the permit path](/our-process/), the cabinet count, and the timeline. This guide separates kitchen projects into three clear tiers so you can budget with real numbers before you invest in design, and know where your project sits before you talk to a contractor.

TL;DR

In 2026, a kitchen remodel on Long Island typically runs $75K-$150K installed, $75K-$125K for a direct replacement, $100K-$150K for a reconfigured layout.

Open-concept conversions and structural rebuilds start around $150,000 and routinely run up, depending on cabinet tier, appliance package, and structural work. Cabinets, layout, and appliances are the three biggest cost levers.

"Most kitchen gut renovations fall within a tighter cost range than people expect. The core costs, including plumbing, electrical, cabinetry, and appliances, are generally similar from one project to the next. Larger kitchens cost more because they require more cabinets and countertops, but those are usually not the biggest price drivers."

Evan Lewitas · VP, Center Island Contracting

![icon-kitchen](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen.png)

### Tier 1 · Typical 2026 Range

#### $75K-$125K

Installed cost to homeowner

| Construction (labor + materials we supply) | $40K-$80K |
| ------------------------------------------ | --------- |
| Client-supplied appliances, fixtures & lighting | $35K-$45K |
| **Total installed cost to homeowner** | **$75K-$125K** |

**Timeline:**

5-8 Weeks

**Permit:**

Often not required

![kitchen-direct-replacement-cic](https://centerislandcontracting.com/wp-content/uploads/2026/06/kitchen-direct-replacement-cic-scaled.jpg)

[
See Examples in Our Project Gallery
](https://centerislandcontracting.com/portfolio/project-gallery/)
Tier 1 · Up to 200 sf · Footprint unchanged

## Direct Replacement

Same footprint. Same appliance locations. New cabinets, counters, and finishes.

Your existing kitchen is the right size and the right layout; it just needs everything inside replaced. We demo to framing, run new electrical and plumbing rough at the existing appliance locations, then rebuild with new cabinets, counters, backsplash, lighting, and finishes. Appliances and sink stay where they are.

#### Included

Full demo to exposed framing in the kitchen footprint
- New electrical rough-in to support the new plan at existing locations
- New plumbing rough-in at existing locations (sink, dishwasher, fridge line)
- New drywall, patching, and paint in the kitchen footprint
- Cabinet installation and hardware install
- Countertop template and install (material per your selections)
- Backsplash installation (material per your selections)
- Finish electrical install for switches, outlets, and lighting fixtures

#### Not Included

- Moving sink, range, refrigerator, or dishwasher locations, that's Tier 2
- Removing structural walls or widening openings, that's Tier 3
- New windows/doors or changing exterior openings
- Whole-first-floor flooring replacement beyond kitchen tie-ins
- Premium appliance packages or panel/service upgrades beyond typical capacity

Tier 2 · Up to 250 sf · Layout changes

## Reconfigured Layout

You keep the kitchen in the same room, but you move walls, plumbing, or major appliances.

You keep the kitchen in the same room, but the sink, range, refrigerator, or dishwasher move. That means new plumbing routing across joist bays, new electrical for relocated appliances and lighting zones, and non-structural wall changes within the footprint. Same finish scope as Tier 1, significantly more complexity underneath.

#### Included

- Everything in Tier 1
- Relocation of one or more major elements (sink, range, fridge, dishwasher)
- New plumbing routing, including drain and venting adjustments as required
- Electrical re-routing for relocated appliances, island runs, and lighting zones
- Under-cabinet lighting wiring and new lighting zone circuits
- Non-structural wall changes within the kitchen footprint
- Permit procurement, filings, and required inspections
- Additional demolition and patching in walls and floors impacted by new routing

#### Not Included

- Removing load-bearing walls, adding beams, or major openings, that's Tier 3
- Relocating the kitchen to a different room or building new adjacent space, that's Tier 3
- Major electrical service upgrades (new service, panel relocation, generator integration)
- Radiant floor heat, hydronic changes, or major HVAC redesign
- Full-house plumbing stack replacement or whole-home re-piping

![icon-kitchen-cabinetry](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen-cabinetry.png)

### Tier 2 · Typical 2026 Range

#### $100K-$150K

Installed cost to homeowner

| Construction (labor + materials we supply) | $60K-$100K |
| ------------------------------------------ | ---------- |
| Client-supplied appliances, fixtures & lighting | $40K-$50K |
| **Total installed cost to homeowner** | **$100K-$150K** |

**Timeline:**

9-14 Weeks

**Permit:**

Required after approval

![gallery-kitchens-islip-2023-09](https://centerislandcontracting.com/wp-content/uploads/2025/10/gallery-kitchens-islip-2023-09-scaled.jpg)

[
See Examples of Reconfigured Layout
](https://centerislandcontracting.com/portfolio/project-gallery/)
![icon-clock](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-clock.png)
Before a Wall Comes Down

## Permit Processing on Long Island Adds 6-10 Weeks To Your Timeline.

It surprises homeowners every time. If your project needs a permit, and Tier 2 and Tier 3 always do, add two-plus months to your calendar before construction begins. Our quoted timelines start from permit approval, not from contract signature.

Why This Matters at Resale

## Some Renovations Improve Your Home.
This Changes Your Home Listing Price.

On Long Island, buyers decide on a home from the kitchen. A closed, dated, builder-grade kitchen sets the ceiling on every other room in the listing. An open, well-laid-out kitchen with real storage and current finishes does the opposite, it carries the rest of the house. It's not an incremental improvement. It's a **reclassification**.

The same logic applies to layout. A galley kitchen closed off from the living space competes in a different category than the same square footage opened up with an island. Removing the wall, even with the same cabinets and counters, moves the home from "needs work" to "move-in ready" for most buyers walking through the door.

### Closed Kitchen → Open

A galley or closed kitchen competes against dated homes on your block. An open-concept kitchen lists in a different category.

### Builder-grade → Custom

Stock cabinets and laminate counters say "still needs work." Custom or semi-custom cabinets with stone tops say "move in tomorrow."

### New Finishes, Same Layout

A new backsplash on a kitchen with the same compromised layout returns less than people expect. The bones matter more than the finish.

Whether this translates to a specific resale number depends on your town, your block, and market conditions at the time you sell. What it does immediately is change how buyers experience the whole house from the moment they walk in.

Built On Long Island Since 2003

## The kitchen is where every
other room in the house gets decided.
Build it like it matters

20+ Years

400+ Kitchens

Nassau · Suffolk · Queens
![icon-kitchen-extension](https://centerislandcontracting.com/wp-content/uploads/2026/05/icon-kitchen-extension.png)
Tier 3 · Structural openings · open-concept or relocated kitchen

## Open-Concept Conversion or Structural Rebuild

Removing structural walls, adding beams, relocating the kitchen, or rebuilding adjacent space.

### Typical 2026 Range

Removing load-bearing walls, adding beams, relocating the kitchen to a different room, or rebuilding adjacent space is a different project from a remodel. Architectural plans, structural engineering, and a permit path through your municipality all come into play before construction starts. We've had clients spend $240K, $300K, $400K+. We can't give you a definitive number until we develop plans, but the range below from real projects should calibrate your thinking.

#### Typical Scope

- Architectural plans and structural engineering
- Permits, filings, inspections
- Framing, structural beams, and load transfer as required
- Full cabinet, counter, appliance and finish build
- Mechanical, plumbing and electrical re-work to suit the new plan

#### Why No Range

- Base pricing (requires plans)
- Landscape / exterior restoration beyond work area
- Adjacent-room work priced separately

### Recent Tier 3 Projects · Real Numbers From Plans

No. 3702 · Hyde Park · 2024

#### Open-Concept Conversion

#### $285K

Load-bearing wall removed between kitchen and family room. New steel beam, full cabinet package, expanded island, panel upgrade.

No. 3991 · Oyster Bay · 2023

#### Relocated Kitchen

#### $340K

Kitchen moved from rear of home to new addition footprint. Custom cabinetry, pro-style appliances, dedicated pantry, two-tone island.

No. 4280 · Garden City · 2025

#### Structural Rebuild + Addition

#### $425K

Rear bump-out and full open-concept conversion. Engineered beam, new mechanicals, pro range, marble counters, full-height pantry wall.

**Tier 3 pricing requires plans.** The case studies above are real budgets from real Long Island projects. Yours will sit somewhere on this spectrum once we develop plans and scope.

[
Request a Plan Review
](https://centerislandcontracting.com/schedule-a-consultation/)
What Drives The Cost Of A Kitchen Remodel

## Ten factors that move your number

Two kitchens of the same size, in the same Long Island town, can produce budgets $30,000 apart. These ten decisions explain why.

01

High

#### Cabinet Package

Stock vs. semi-custom vs. full custom is the single biggest swing. A typical spread between entry-level and high-end packages runs $25,000+.

02

High

#### Layout Changes

Moving a sink, range, or refrigerator changes plumbing and electrical routing, often framing too. Add-ons typically run $10,000-$35,000.

03

High

#### Appliances

A basic package is not comparable to built-ins or pro-style cooking. Appliance spend routinely ranges $10,000-$50,000+ depending on brand.

04

High

#### Electrical Capacity

Older homes often need more circuits, lighting zones, and sometimes panel or service upgrades. Add $5,000-$20,000+ when capacity is the constraint.

05

High

#### Structural Openings

Removing a load-bearing wall requires engineering, beams, posts, and inspections. A structural opening commonly adds $10,000-$30,000+ before finish.

06

Medium

#### Countertops

Quartz vs. natural stone vs. porcelain slab changes fabrication and install. Countertops commonly range $6,000-$18,000+.

07

Medium

#### Flooring Tie-In

If the kitchen floor ties into adjacent spaces, you may be refinishing more than the kitchen footprint. Add $5,000-$20,000 depending on material.

08

Medium

#### Plumbing Scope

Pot fillers, filtered water, ice maker lines, and venting changes add cost. Plan $2,000-$12,000+ depending on how much moves.

09

Medium

#### Windows & Exterior Tie-In

Changing a window, adding a slider, or adjusting openings impacts framing, exterior finishes, and permits. Add $5,000-$35,000+.

10

Medium

#### Tile & Backsplash

Basic tile and specialty patterns don't price the same. Budget $2,000-$12,000+ depending on coverage and material.

Selected Work

## A few recent kitchens.

Design-build from structural scope through final punch list.

![new-kitchen-pricing-guide](https://centerislandcontracting.com/wp-content/uploads/2026/06/new-kitchen-pricing-guide-scaled.jpg)

![kitchen-cic](https://centerislandcontracting.com/wp-content/uploads/2026/06/kitchen-cic-scaled.jpg)

![kitchen-cic-1](https://centerislandcontracting.com/wp-content/uploads/2026/06/kitchen-cic-1-scaled.jpg)

![gallery-kitchens-massapequa-2024-01](https://centerislandcontracting.com/wp-content/uploads/2025/10/gallery-kitchens-massapequa-2024-01-scaled.jpg)

[
View Full Portfolio
](https://centerislandcontracting.com/portfolio/project-gallery/)
Where We Build

## See kitchen work in your area.

Every town has its own permit process, electrical inspector, and code quirks. Browse finished kitchens near you.

### Nassau County

- Bellmore

- East Meadow

- [Garden City](https://centerislandcontracting.com/locations/general-contractor-in-garden-city-ny/)

- Great Neck

- [Manhasset](https://centerislandcontracting.com/locations/home-additions-in-manhasset-ny/)

- Merrick

- Rockville Centre

### Suffolk County

- Babylon

- Commack

- Huntington

- Northport

- Smithtown

### North Shore

- [Cold Spring Harbor](https://centerislandcontracting.com/locations/home-additions-cold-spring-harbor-ny/)

- Lloyd Harbor

- Locust Valley

- Oyster Bay

### South Shore

- Lindenhurst

- [Massapequa](https://centerislandcontracting.com/locations/home-additions-in-massapequa-ny/)

- Seaford

- Wantagh
[
Browse Projects by Service Area
](https://centerislandcontracting.com/residential-construction-services/service-areas/)
Common Questions

## Frequently Asked Questions

### How much does a kitchen remodel cost on Long Island in 2026?

A kitchen remodel on Long Island in 2026 typically lands in one of two scopes. A Tier 1 direct replacement, same footprint, same appliance locations, runs $75,000-$125,000 installed. A Tier 2 reconfigured layout, moving plumbing, appliances, or walls, runs $100,000-$150,000 installed. Tier 3 projects, structural openings, relocating the kitchen, or rebuilding adjacent space, are priced by plans, but they commonly start around $150,000 and can run $350,000+ depending on cabinet tier, appliance package, and electrical scope.

### Can I keep my existing cabinets or appliances?

Appliances, sometimes. Cabinets, rarely. If your appliances are recent, standard-sized, and fit the new cabinet plan, keeping them can be a clean way to control cost. Cabinets are different. Once you change counters, layout, or storage, reusing existing boxes typically forces compromises that look fine on paper and disappoint in real life. The practical approach is to decide early whether you are designing around existing appliances, because that choice affects cabinet sizing, electrical locations, and ventilation.

### Do I need a permit for a kitchen remodel?

For a Tier 1 direct replacement where nothing moves, sometimes not. The moment you relocate a sink, range, or refrigerator, touch plumbing vents, change electrical scope meaningfully, or remove walls, yes. Tier 2 and Tier 3 projects should be assumed permitted. We plan timelines from permit approval, not from contract signature, because on Long Island permit processing can add 6-10 weeks before construction begins.

### How long will I be without a kitchen?

Plan on your kitchen being out of full service for most of the construction window. A Tier 1 direct replacement typically runs 5-8 weeks once we mobilize. A Tier 2 reconfigured layout typically runs 9-14 weeks once we mobilize. The reality is that demo, rough plumbing and electrical, inspections, drywall, cabinetry, counters, and finish installs happen in sequence. If you cook daily, you should plan a temporary setup, microwave, coffee, and a sink plan, before day one. [Here are what to expect when remodeling.](/resources/what-to-expect-when-remodeling/)

### What's the difference between the construction cost and the total cost?

The construction number covers labor, trades, permits, and the materials we supply, demolition, framing, electrical rough and finish, plumbing rough and finish, drywall, carpentry, paint, and installation coordination. Your total installed cost also includes items homeowners often choose directly, most notably appliances, fixtures, and some lighting selections. In kitchens, appliance packages alone can span $10,000-$50,000+, which is why two kitchens with the same footprint can land in completely different total budgets.

### What actually adds resale value in a kitchen remodel?

On Long Island, buyers do not just look at finishes. They look at function. A kitchen that reads as bright, clean, and well laid out removes the "needs work" objection immediately. The highest-value moves are usually layout and storage, workable aisles, landing zones, a real pantry solution, and lighting that makes the room feel finished. Premium appliances and exotic stone can help at the top of the market, but they do less for resale if the layout is still compromised. The goal is not to overspend. The goal is to make the kitchen feel inevitable for the home.

### Why are cabinets so expensive?

Cabinets are not a single line item. They are the structural system of the kitchen. Cost is driven by box construction, door material, finish quality, hardware, interior accessories, and the time it takes to install and scribe everything to real walls that are rarely perfectly straight. Moving from entry-level to higher tiers often adds $25,000+ in Long Island kitchens once you account for customization, storage features, and installation complexity. Cabinets also affect every other scope decision, counter templates, appliance fit, lighting, and trim.

### What do your tier prices assume?

Tier 1 assumes the kitchen stays in the same footprint and appliance locations do not move, no sink relocation, no new plumbing routes, no wall removals that change structure. Tier 2 assumes the kitchen stays in the same room, but the layout changes, plumbing and electrical move, and permits are part of the process. Tier 3 assumes the scope is structural or architectural, removing load-bearing walls, adding beams, relocating the kitchen, or rebuilding adjacent space. The tier ranges also assume a typical Long Island selection level; if you choose fully custom cabinets, a high-end appliance package, or extensive structural openings, the budget moves accordingly.

Ready to Scope Your Project?

Schedule a 15-Minute Consultation

We'll review your home type, your municipality, and your goals, then give you an honest budget range before you spend a dollar on design. No obligation, no pressure; just real numbers from a firm that has been building on Long Island for 20+ years.

[
Schedule a Consultation
](https://centerislandcontracting.com/schedule-a-consultation/)
or call [(516) 481-4707](tel:+1-516-481-4707)